The Legacy Project

Quick Facts

Preschool – Nursery Addition (PHASE 1) - COMPLETED! (4/16/2017)

  • 8 new classrooms, resource room, nursing room
  • New indoor playground at lobby – check-in station
  • Glass wall at check-in looking into new indoor playground
  • Designated stroller parking area
  • New Volunteer break room

 

New Worship Center - Connector/Fellowship Lobby (PHASE 2)

  • 1,000 seats (with possible future expansion)
  • Large lobby with open seating & gathering area
  • Café/Coffee Area
  • Choir Practice Suite on 1st  floor behind stage
  • Large men’s and women’s bathrooms
  • Added storage and miscellaneous support rooms
  • Flat floor for main worship floor area
  • Two story connection from existing building to new Worship Center

 

New Youth Center (PHASE 3)

  • Youth worship and activity center with built-in stage and storage areas
  • Kitchen area and hang out area
  • Connection lobby between the two youth buildings (classroom and worship)
  • Gaming area in existing building (at old maintenance shop location)
  • New maintenance shop

 

New Office Addition / Renovation of Old Youth Area for Children / Renovation of Old Administration Building for Youth (PHASE 4)

  • 2 story admin and 2nd floor education space
  • 12 staff offices, storage, work room, & break room
  • Pastor’s suite with study
  • Conference room
  • Large lobby for visitors
  • Unfinished future space on the 2nd floor for future education, flex space
  • Renovation of youth worship area into new children’s church and worship area
  • Add six (6) renovated classrooms for children
  • New children’s check in on 2nd floor
  • Education space for youth

 

Other Facts

  • 14 Acres - Total Overall Disturbed Site for New Addition and Parking lots
  • 100+ New Parking Spaces
  • Drive Under – Drop-off’s for Worship Center